What are ÄTA works (change orders) in Swedish construction?

Author:
Christos Potamitis
Published:
Updated:
3 min read

Short answer

ÄTA stands for changed, additional and omitted work (ändrings-, tilläggs- och avgående arbeten): work that is changed, added or removed compared with what was agreed at the start of a construction project. ÄTA should be ordered by the client, priced according to the contract and documented when it happens. Otherwise it is hard to get paid for.

What does ÄTA mean?

ÄTA is the umbrella term for everything that changes in a construction project after the contract is signed. Some examples:

  • Change: the client wants tiles instead of parquet in the hall.
  • Addition: an extra power outlet in every room.
  • Omission: a storage shed that won't be built after all.

How is ÄTA ordered and priced?

ÄTA work should be ordered by the client, preferably in writing and before it is carried out. The price follows the contract, for example unit prices, a fixed price for that change, or time and materials.

If nothing specific was agreed, the contract and the standard terms it refers to apply. Most common are AB 04 for construction contracts and ABT 06 for design-and-build contracts.

When the client is a private person, the Consumer Services Act (konsumenttjänstlagen) applies, and repairs and renovations often use Hantverkarformuläret 17 as the contract. Under the act you must contact the customer and ask before doing additional work. If you can't reach them, you may only go ahead if the price is negligible or low compared with the job, or if there is particular reason to believe the customer wants it done.

How to document ÄTA

  • What is changing and why.
  • Who ordered the change and when.
  • The price, or how the price will be worked out.
  • Photos before and after.
  • The client's approval.

Do it before the work starts, or as soon as you can. The longer you wait, the harder it is to agree on what was said.

ÄTA and invoicing

Approved ÄTA is often invoiced separately or as separate lines on the invoice, so the client sees what is a change and what was included from the start. Keep contract work and ÄTA apart in the project's accounts, so you see what each project actually costs and earns.

Naexit builds digital tools for construction companies, where ÄTA is logged on site with photos and a price and approved straight away on the phone. Read more about systems for construction companies.

Frequently asked questions

  • Additional work is part of ÄTA. ÄTA is the umbrella term for changes, additions and work that is removed.
  • It depends on the contract, but in writing is always safest. A verbal order is hard to prove if you disagree on price or scope.
  • The change usually comes from the client, but the contractor should speak up straight away if the work turns out to need more or something different from what was agreed.
  • Yes. Omitted work, the A in ÄTA, is work that is removed and so lowers the price.

Sources

  1. [1]AB 04, General Conditions of Contract for building, civil engineering and installation works (in Swedish) · Svensk Byggtjänst
  2. [2]The difference between AB 04 and ABT 06 (in Swedish) · Svensk Byggtjänst
  3. [3]Consumer Services Act, konsumenttjänstlag (1985:716) (in Swedish) · Sveriges riksdag
  4. [4]Hantverkarformuläret 17, the standard contract for consumer repairs and renovations (in Swedish) · Konsumentverket
Christos Potamitis
AuthorChristos PotamitisHead of Operations
Contact

Got a project in mind?

Tell us briefly what you want to build, and we'll get back to you and take it from there.

Cookie settings

Choose which cookies we may use. Necessary ones keep the website working and can't be switched off. You can change your choice at any time.